Fire Alarm Inspection Gamewell Fire Alarm Panel with Starlink Cell Dialer. Inspecting common areas of the building only program their monitoring system to report to CMS- acct# SLTAK9986
Industrial suppression systems are due for hydrotest: MIXING ROOM: (1) PCL MONARCH 17# ABC (MAN 2001) DUE FOR TEST PAINT BOOTH: (1) PCL MONARCH 17# ABC (MAN 2001) DUE FOR TEST (1) PAC 10 NITROGEN TANK DUE FOR TEST (MAN 2001) (1) PCL MONARCH 70# ABC HYDROTEST (1) PCL MONARCH 17# ABC REPLACE WITH NEW DUE TO RUST Industrial/Dry Chemical Suppression Repair Deficiency: Div 7: Cylinders on industrial suppression systems are due for hydrotest: MIXING ROOM: (1) PCL MONARCH 17# ABC (MAN 2001) DUE FOR TEST PAINT BOOTH: (1) PCL MONARCH 17# ABC (MAN 2001) DUE FOR TEST (3/3) (1) PAC 10 NITROGEN TANK DUE FOR TEST (MAN 2001) * RECOMMEND SERVICING THE (2) REMAINING TANKS TO KEEP EVERYTHING ON SCHEDULE: (1) PCL MONARCH 70# ABC (MAN 2014), HYDROTEST (1/3) (1) PCL MONARCH 17# ABC (MAN 2014), REPLACE DUE TO RUST (2/3)
Annual Fire Alarm Inspection (33 devices) Potter p -200
Brad called in - He had Mike speak to Keith who was on site. They believe on of the boosters took a lightning hit. the booster is current disconnected from the panel. (booster is located in the first shop to the left.) Acct # SLTAK9441 - Schedule with either Brad - 616-706-5278 or the LASR office 269-292-5277 **** system in test with CMS until serviced- please take out of test once service is complete.